Chargement en cours

Health and Safety Manager - Datacenter Construction (H/F/X)

PARIS, 75
il y a 1 jour

Health and Safety Manager - Datacenter Construction (H/F/X)

Paris, France (On-site)

Job Info

  • Job Identification 7377
  • Job Category Health & Safety
  • Job Schedule Full time
  • Job Shift Day

Job Description

Step into a pivotal role where your leadership will shape safety culture at some of Europe's most cutting-edge construction sites, including prominent data centers in Paris.You will be based on Paris and there will be some occasional travel across Europe.As the Health & Safety Manager, you'll be the driving force for ensuring visible, effective safety standards and continuous improvement. Champion best practices and empower teams to mitigate risks, collaborating with passionate professionals dedicated to compliance, innovation, and excellence.

Reporting Structure

  • Reports directly to the Regional Health and Safety Director.
  • Collaborates across internal departments & the international Health & Safety community.
  • Engages externally with contractors, customers, auditors, and consultants.

Your Mission

  • Lead and evolve health and safety management systems in accordance with ISO 45001.
  • Serve as a trusted partner to general contractors and project managers, ensuring safety is at the forefront.
  • Shape processes and tools that proactively control high-risk activities, keeping every site mission-safe.
  • Drive awareness, deliver engaging training, and foster a high-performing safety culture.

Key Responsibilities

  • Site HSE Supervision
    • Embed and deploy Health & Safety Policy onsite
    • Analyze daily operations and high-risk activities (HRA)
    • Conduct frequent site safety visits and generate actionable reports
    • Identify safety gaps, propose solutions, and track corrective actions
    • Build key safety performance indicators, drive preventive and corrective strategies
    • Cultivate feedback channels and participate in site safety meetings
    • Recommend innovative technical improvements in partnership with contractors
    • Investigate accidents, formulate corrective measures, and drive field awareness
  • Project Management
    • Collaborate with legal, technical, and procurement teams to integrate safety into project designs and processes
    • Develop and update HSE specifications for site launches
    • Lead risk analysis and deploy targeted action plans from project inception
    • Ensure full compliance throughout project life cycle
    • Support HSE protocols during site reception
  • Drive safety communication via newsletters, intranet, and field sessions
  • Lead creative training and awareness campaigns, assessing team skills and readiness
  • Develop and maintain guides/FAQs for basic site safety (evacuation plans, layout, fire safety)
  • Management Systems
    • Enforce Information Security and Integrated Management System protocols
    • Report and respond to security incidents with agility
    • Continually optimize management systems—delight internal and external clients
  • Minimum 5 years’ experience in Health and Safety within construction environments
  • Excellent command of French and English
  • Advanced skills in MS Word, Excel, PowerPoint
  • Deep knowledge of EMEA health and safety regulations, audit techniques, risk analysis & ISO 45001
  • Membership with IOSH or EMEA equivalent, striving towards chartered certification

Core Competencies

  • Inspirational safety leader with a proactive, can-do attitude
  • Strong commitment to compliance, professionalism, teamwork, and customer-centricity
  • Natural authority, hands‑on mindset, meticulous attention to detail
  • Exceptional communicator and collaborator
  • Self-driven, pragmatic, able to juggle multiple projects and priorities
  • Resilient and adaptive in dynamic environments

Qualifications

  • Degree or diploma specialized in health and safety

NOTES:

The above statements are intended to describe the general nature and level of work being performed by people assigned to this job. They are not intended to be an exhaustive list of all responsibilities, duties, and skills required of personnel so classified.

Digital Realty is an equal opportunity employer, EOE/AA/M/F/Vets/Disabled. All applicants will receive consideration for employment and will not be discriminated against on the basis of race, color, religion, sex, sexual orientation, gender identity, age, national origin, disability or protected veteran status, or other status protected by law or Company policy.

Digital Realty is a publicly traded company (NYSE: DLR) with investment grade ratings from all three major ratings agencies.

#J-18808-Ljbffr
Entreprise
Digital Realty Austria GmbH
Plateforme de publication
WHATJOBS
Offres pouvant vous intéresser
QUIMPER, 29
il y a 23 heures
PARIS, 75
il y a 23 heures
TOULOUSE, 31
il y a 21 heures
Soyez le premier à postuler aux nouvelles offres
Soyez le premier à postuler aux nouvelles offres
Créez gratuitement et simplement une alerte pour être averti de l’ajout de nouvelles offres correspondant à vos attentes.
* Champs obligatoires
Ex: boulanger, comptable ou infirmière
Alerte crée avec succès