FPSO Topsides structure - Weight Control Engineer
PARIS, 75
il y a 1 jour
Description
MISSIONS / SERVICE DIMENSIONS
The Topside Structure / Weight Control Engineer ensures the structural integrity and weight compliance of FPSO topside modules throughout the EPSCC phases, Key missions include:
- Monitor and validate structural design and weight control activities performed by contractors and vendors.
- Ensure topside weight and center of gravity (CoG) evolution remains within marine and structural constraints.
- Assist the Topsides Structural Lead in managing technical interfaces and compliance with project specifications.
- Contribute to the traceability and consistency of structural and weight-related decisions across engineering phases.
- Participate in design reviews, technical clarifications, and anomaly resolution processes.
- Promote & comply in all activities with applicable safety instructions and other company HSE rules.
ACTIVITIES
- Review contractor deliverables including structural drawings, calculation notes, FEM analyses, and lifting/marine operation reports.
- Track and validate weight data and CoG evolution using dedicated weight control tools and registers.
- Participate in multidisciplinary design reviews (e.g., model reviews, HAZID/HAZOP) and coordinate with process, layout, piping, and marine teams.
- Interface with contractors and subcontractors to ensure constructability and compliance with structural and weight requirements.
- Support the Topsides Structural Lead in managing deviations, changes, and anomaly reporting related to topside structure and weight control.
CONTEXT & ENVIRONMENT
- The Venus FPSO will operate in ultra-deepwater at roughly 3,000 m and is designed to process 160,000 bbl./d of oil with advanced systems to manage large volumes of associated gas, which will be re-injected to maintain reservoir pressure. The unit will be permanently spread-moored using a 16-line mooring system, engineered to ensure station-keeping in relatively harsh Atlantic conditions. The development includes up to 40 subsea wells tied back to the FPSO via the subsea architecture.
- International and multi-cultural environment.
- Position permanently based in EPSCC Contractor premises.
- Frequent mission aboard.
DURATION / LOCATION
- Starting date: October 2026 (subject to FID)
- Duration: 1 year to 4 years after FPSO contract Award
- Renewable: Yes
- Location: Between 1 and 2 years in Paris – France, up to 18 months in Singapore, up to 18 months in Geoje – South Korea.
- Status: Residential
- Degree in Structural Engineering, Naval Architecture, or Mechanical Engineering.
- Minimum 5–10 years of experience in offshore structural engineering, including FPSO topside design and weight control.
- Experience working in client-side roles within EPSCC project environments.
- Proficiency in structural analysis tools and weight control systems.
- Familiarity with international standards such as API, Eurocodes, ISO, and marine classification rules.
- Strong coordination and communication skills in a multidisciplinary and multicultural project environment.
Requirements
- Weight control
- FPSO
- English
- Detailed design
Entreprise
SeaOwl Group
Plateforme de publication
WHATJOBS
Offres pouvant vous intéresser
PARIS, 75
il y a 1 jour
SIX FOURS LES PLAGES
il y a 8 jours
PARIS, 75
il y a 1 jour
PARIS, 75
il y a 1 jour