Chef d'Equipe VRD (F/H)
Chef d'Equipe VRD (F/H)
Skip to main content
This website needs functional cookies that are essential for a good performance of this webpage and are necessary to enhance your user experience. The installation of preference cookies that are necessary to collect data for the website performance, its statistics and website journey as well as the behavioral analysis and prospecting activities of the marketing services, is done when you accept all the cookies. To continue your browsing on this website, please make your choice for the cookies installation. d'Equipe VRD (F/H) page is loaded## Chef d'Equipe VRD (F/H)
Applylocations: Saint-Thuriautime type: Full timeposted on: Posted 30+ Days Agotime left to apply: End Date: December 31, 2026 (30+ days left to apply)job requisition id: JR Eiffage Route contribue à l’amélioration du réseau français, des voies communales aux tracés autoroutiers, qu’il s’agisse de conception, de construction ou d’entretien. Experte en aménagement urbain, Eiffage Route participe également à la réalisation de projets portuaires, aéroportuaires, industriels et commerciaux.
MISSIONSTeam management- Complete onboarding of employees, temporary staff and sub-contractors Present the building site, its challenges, risks and the construction works to be completed to employees Perform role of Deputy Site Supervisor, act as interim manager by delegation or necessity Manage building site personnel on a daily basis, ensure that schedules are respected and promote initiatives and positive conduct Organize and plan the missions and the work of the teams, based on building site requirements and progress, in close collaboration with the Site Supervisor
- Prepare the work for completion by recognizing the constraints of the plot and the work documentation, as well as building site access and environment Clearly define construction works to be completed, develop underground networks and to identify all obstacles that could impact completion Ensure the implementation of signage and security devices, prepare the access roads, storage areas and set up the building site’s living quarters, if appropriate (manage the company’s brand reputation: labeling, marking, etc.) Plan ahead for equipment and materials needed, in agreement with the Works Supervisor Participate in defining the construction works schedule and operating procedure Supply and install the tools, materials and consumables on the building site (the right amount, at the right size and in the right place) Receive and check the equipment, materials and tools; put them in place at the building site Check their compliance with approved product sheets
- Assign tasks to blue collar workers and technicians based on skill sets and added value Monitor the progress of the works schedule Supervise the construction of the works based on the schedule, operating procedure and analysis of the risks identified Perform technical checks during construction (materials, production of materials on the site, compliance with the plan, etc.) and decide on any corrections to be made together with the Site Supervisor. Track consumption (hours, materials, equipment), analyze deviations and determine the necessary corrective actions Participate in building site meetings Ensure the proper use and maintenance of equipment and facilities by performing the necessary maintenance and upkeep Draft and communicate monitoring records and building site reports Ensure access to documentation currently in force to be used (plans, procedures, etc.)
- Ensure full application of guidelines, procedures and rules to oversee individual and collective security on the building site Produce reporting for various managers regarding the completed construction works and difficulties experienced Ensure the quality and security of the construction works within planned lead times Manage environmental constraints and ensure the full adoption of the corresponding measures Before leaving the construction work area, ensure the quality of the services provided (acceptance, resolution of stop points or feedback items, cleanliness, etc.) Weekly team security management (Safety Force, Security 1/4 hour, etc.)
- Participate in construction handover and resolution of stop points Ensure regular cleaning of the work area and security of surrounding area Actively participate in building site withdrawal, ensuring the return of materials and equipment and the disposal of waste At the end of workdays, ensure building site equipment is fully stored and secure Ensure that the equipment and materials are restored to their initial state; indicate any deteriorations Inventory remaining supplies and returned equipment, identifying discrepancies and reasons
- Excavation floor protection
- Set up the formwork for the foundations or bosses Assemble and use outdoor work stations and platforms Assemble and adjust the climbing forms and other formwork
- Assemble reinforcements based on the reinforcement plan: raft foundations, walls, veils, beams, slabs, etc. For pre-stressed constructions: beams, vessel walls, etc.
- Deploy and vibrate concrete Carry out concrete checks Spray the concrete using the wet-mix or dry-mix process
- Assemble and check the scaffolding used for access, working platforms and shoring Manage dismantling operations
Networks installation: hydraulic equipment
Prefabricated parts installation: standard and complex elements
Finishing- Carry out minor alterations Level out, coat and paste composite materials
- Install bars and/or cables Fit, inject and stress
- Install/brace jacks Set the hydraulic load, proceed without computer-aided lifting Transfer loads
SPECIAL WORKS TEAM LEADERMission identical to CIVIL ENGINEERING/DAM TEAM LEADER and involves the following additional missions
Concrete pre-stressing- Implement bars and/or cables Fit, inject and stress
- Install/brace jacks Set the hydraulic load, proceed without computer-aided lifting Transfer loads
- Manage mortar dosage/binding agent spreader Assess ground water content
ASBESTOS REMOVAL TEAM LEADERSchedule and organize analyses based on defined sampling strategy and construction works progress
Carry out daily visual checks of containment and a general check of the area
PIPE TEAM LEADER/FEEDEREarthworks- Survey and identify networks Equip work areas and prepare the bottom of the trenches in which the pipes will be laid Excavate special points
- Load, pre-bend/bend (weathertight) Weld tubes, encase joints Check proper interlocking and blocking of pipelines Lower into excavations, connect piping sections Locate pipeline faults and identify the cause Test and clean constructed pipelines Assemble the prefabricated parts of the construction
- Sling and handle loads
- Observe client requirements Put back to initial state Observe the material thicknesses to be used Adhere to the number of passes for compaction
- Use building site’s small equipment and machines Ensure routine maintenance of small machines
- Apply safety instructions related to the conditions of their job and remain focused at all times on operations safety (rail risks, electrical risks, work in the presence of trains, work in the presence of public works and rail machines) Dismantle the components of the track and track switches Perform manual removal of old ballast Assemble the components of the track and track switches, using the appropriate techniques and tools Lay the new track and/or track switch using a mechanical or manual system (gantry or dual cranes) Unload the appropriate amount of ballast Level the track: ballasted track and concrete track Participate in rail removal and track switch installation Carry out maintenance work on track components or switches Carry out resurfacing work on plain line tracks and track switches
- Manage concrete orders Check the guide wire Coordinate machine progress by monitoring the height of mold sets Carry out construction control operations behind the machine (altimetry, height, etc.) Assist their team with construction works
- Ensure the installation of a roller track based on construction layout Ensure an aligned guard rail and altimetric settings adjusted within the standards Ensure compliance of construction connection and specific points
- Perform additional staking out for an external works or roads & utility services project Lay out the detailed additional staking out; altimetric positioning of the structures, etc. Mark out for masonry work and external works or roads & utility services construction
- Carry out the preparatory earthworks
- Dig curved or sloping trenches using a digger or backhoe loader and close them
- Lay the various service pipes: connections to inspection chambers, breech-pieces, pressure taps and miscellaneous facilities
- Consolidate the plot for asphalt emulsion coating Apply asphalt manually Lay paving stones and concrete slabs
JOB REQUIREMENTSProfessional experience in building and public works
Authorizations as required:AIPR, H0 B0, ATEX, OPPBTP– Minimum Safety Training Standards (SMS) – Chemical risks
Authorization to intervene near networks (AIPR) and SMS French Certificate of Fitness for Safe Driving (CACES) possible as required
JOB ENVIRONMENTReporting line:Site Supervisor, Works Supervisor
Internal relations:Building Site Team, Machine/Vehicle Operators
External relations:Service providers – sub-contractors – clients (small building sites) – local residents – suppliers**Vous souhaitez vous investir au sein d'un grand groupe capable de vous offrir de réelles opportunités de carrière. Alors rejoignez-nous !**
#J-18808-Ljbffr